YR-HLS  GWC

YR-HLS GWC

Automatic Fence Panel Welding Production Line. (Mesh Welder)

This production line utilizes fully automated CNC technology to weld steel bars into mesh products. Therefore, it is not only speedy but precise. The products are widely used in many areas, such as civil, public, construction, highways, hydraulic, bridges, container terminals, and airport runways and other engineering projects. For mesh dimensions above 10 cm with increasing in increments of 50 mm, this production line can guarantee welding mesh quickly, smoothly and seamless transitions from one mesh dimension to the next one. The most critical feature of this system is its ability to weld steel mesh with both precision and speed, ensuring consistent and high-quality output.

Main Parts of Mesh Welde

·  Double Longitudinal Bar Hopper Wire Dispensing Unit

·  Main Welding Machine

·  Cross Bar Storage Rack with Sorting and Blanking Mechanism

·  Mesh Stepping Forward Servo Mechanism (Pulling System)

·  Automatic Mesh Grabbing and Stacking System

Machine Specification

Parameters

Unit

Value

Note

Diameter   of Steel Bar

mm

Ф3.0-Ф8.0


Max of   Mesh Width

mm

2500


Mesh   Size

Space   of Longitude bar

mm

100


Space   of Transvers bar

mm

100--400(steeples adjustable)

No.   Weld Joints

Points

25


Strikes   of Weld

Times/min

50--70


Max   Steel Bar Diameter

mm

¢8+¢8


Total   Electrode Transformer Capacity

KVA

160×7


Main   Transformer Capacity

KVA

200-315KVA(<150M)


Welding   Transformer Duty Cycle


30%


Power   Supply Voltage

V

380


Power   Supply Frequency

Hz

50


System   Pneumatic Pressure

Mpa

≥0.6


Cooling   Water Pressure

Mpa

0.2≤P<0.3


Compressed   Air Consumption

M3/min

≥3


Longitudinal   Bar Feeding


Straight   bars, straightness ≤ 3 mm / 1000 mm


Transverse   Bar Blanking



For detailed configuration plan, please Email: Sales@yrmachine.com / Kevin.Zhang@yrmachine.com